'Write a bug report' and 'what's the difference between severity and priority' come up in every QA interview. I've covered all the test documentation on one example: the bug report, the bug life cycle, the test case, the checklist, the test plan, the traceability matrix and the test report. With tables, templates and interview tasks.
- The tester writes a bug card: steps to reproduce, actual and expected result.
- He carries it to the board and pins it: the bug is filed in the tracker.
- A developer comes over and reads it; the report is clear without questions.
- The card is stamped fixed: next, the tester retests the bug.
Everything QA needs to be able to write — from a bug report title to a test report, on one running example

Why Should QA Write Documentation at All?
Because a bug you found is not a result yet. The result is a bug that got fixed.
Here’s a typical situation. A tester finds a serious error in checkout and writes in the tracker: “Promo code calculates wrong”. The developer opens the ticket, enters a promo code — and for them it calculates correctly. Status “Cannot Reproduce”, ticket closed. Two weeks later customers find the same bug, this time in production.
The bug was found in time. But it was described in a way that made it impossible to reproduce — and therefore to fix.
QA needs documentation for four things:
| # | Why | Example |
|---|---|---|
| 1 | So the bug gets fixed | The developer reproduces the error from the steps in two minutes instead of writing “works on my machine” |
| 2 | So knowledge doesn’t leave with a person | A colleague opens a test case and checks payment even if they’re seeing it for the first time |
| 3 | To show what was checked | The question “did you test refunds?” gets an answer with a link, not “I think so” |
| 4 | To decide whether you can release | A report: what passed, what failed, which bugs are open and what that means |
A tester doesn’t always write code. But text — every day. The bug report, the test case and the report are the product QA hands to the team.
What Is Test Documentation (in Plain Words)
Imagine you’re taking your car to a garage. You can say: “Something’s knocking”. The mechanic will drive a lap around the yard, hear nothing and hand the keys back. Or you can say: “A knock at the front right, at speeds above 40 km/h, when turning the wheel left, started after the tyres were changed”. With the second description the mechanic knows where to look and how to repeat it.
A bug report is the same thing, only for a developer. And the rest of the documentation answers the neighbouring questions: what we check, how we check it and what came out.
Three key terms:
- Bug report (defect report) — a description of one error: what is broken and how to repeat it.
- Test case — a description of one check: what to do and what should happen.
- Test plan — a description of the work as a whole: what we test, with what, who, when and when we stop.
All the examples below use one product: an online shop, the checkout page with a cart, a promo code, delivery and card payment.
Anatomy of a Bug Report
A good bug report answers three questions: what happened, how to repeat it and what should have happened instead.
| Field | What to write | Example |
|---|---|---|
| Title (Summary) | What, where, under which condition | Promo code discount is not recalculated in the cart after the item quantity is changed |
| Environment | Test environment, build version, browser, OS, device | staging, build 2.14.0, Chrome 141, Windows 11 |
| Preconditions | What must be ready before the first step | The user is logged in, the cart is empty |
| Steps to Reproduce | Numbered actions, one action per step | 1. Open… 2. Click… |
| Actual result | What really happened | The discount stayed at $4.00 |
| Expected result | What should have happened and how you know it | Discount $10.00, requirement REQ-CHK-07 |
| Attachments | Screenshot, video, logs, a request from DevTools | cart-discount.png, a HAR file |
| Severity | How badly the bug breaks the product | Major |
| Priority | How urgently it should be fixed | High |
The title formula: what + where + when (under which condition). The title is read more often than anything else: in the ticket list, in a report, when searching for duplicates. It should make the bug clear without opening the ticket.
| Bad | Good |
|---|---|
| Promo code doesn’t work | Promo code discount is not recalculated in the cart after the item quantity is changed |
| Payment error | Checkout: 500 error on card payment if the delivery address contains the № character |
A Bad Bug Report
Title: Promo code doesn't work!!!
Description:
I entered a promo code, the price is wrong. I think it worked before.
Fix it urgently, this is critical!
Severity: Critical
Priority: High
What’s wrong here:
- The title says nothing. Which promo code? Is it not applied, calculated wrong, throwing an error?
- No steps. The developer will enter a promo code, see the right discount and close the ticket.
- No data. Which item, what price, which code, what total came out?
- No expected result. “Wrong” — so what is right?
- No environment. Test environment, build, browser — unknown.
- Emotions instead of facts. “Urgently” and three exclamation marks don’t replace a description of the impact on the user.
The Same Bug, Written Well
Title: Promo code discount is not recalculated in the cart
after the item quantity is changed
Environment:
Env: staging
Build: 2.14.0
Browser: Chrome 141, Windows 11
Account: buyer_test_07
Preconditions:
1. The user is logged in.
2. The cart is empty.
3. Promo code SALE10 is active (10% off the whole order).
Steps:
1. Add the item "Ceramic Mug" ($20.00) to the cart, quantity: 2.
2. Open the cart.
3. Enter the promo code SALE10 and click "Apply".
-> Subtotal $40.00, Discount $4.00, Total $36.00 (correct).
4. Change the item quantity from 2 to 5.
Actual result:
Subtotal $100.00, Discount $4.00, Total $96.00.
The discount is still based on the old amount.
Expected result:
Subtotal $100.00, Discount $10.00, Total $90.00.
The discount is recalculated on any change to the cart (REQ-CHK-07).
Additional info:
- Reproduces 5 times out of 5.
- After a page refresh (F5) the discount becomes correct: $10.00.
- If you click "Checkout" without refreshing, the order is created for $96.00.
Attachments: cart-discount.png, cart-discount.mp4, cart-requests.har
Severity: Major
Priority: High
Why this version is better:
- An expected result with a link to the requirement. There will be no need to argue about whether it’s a bug.
- The “Additional info” block narrows the problem down. Since the total is correct after F5, the server calculates properly — it’s the UI that doesn’t update. But the order is still created with the wrong total, and that already affects money.
- One report — one bug. If you also noticed a typo in the cart along the way, that’s a separate ticket.
About attachments: a screenshot shows the result, a video shows the way to it, and a request from DevTools → Network shows what really went to the server and what came back. How to grab a request in one command with Copy as cURL — I showed in the article on API testing.
Severity vs Priority
A question asked in every interview.
- Severity — how badly the bug breaks the product. It’s a technical assessment, usually set by the tester.
- Priority — how urgently the bug should be fixed. It’s a business decision, usually made by the product manager or the team lead. The tester can suggest a value.
Typical scales (every company has its own names):
| Severity | What it means | Example in checkout |
|---|---|---|
| Blocker | You can’t use the product or keep testing | The checkout page doesn’t open |
| Critical | A key feature is broken, there is no workaround | Card payment fails for everyone |
| Major | A feature works incorrectly, but there is a workaround | The discount isn’t recalculated until you refresh the page |
| Minor | A small error, the main flow isn’t affected | The postal code is accepted with a trailing space |
| Trivial | Cosmetics | A typo in a field hint |
Priority is most often High, Medium, Low (or P1–P4). Usually a serious bug is fixed urgently, and a small one whenever there’s time. But not always. The interviewer expects examples for the two “crossed” cells:
| High Priority | Low Priority | |
|---|---|---|
| High Severity | Visa card payment fails: orders are being lost right now | Checkout crashes in a browser that a few customers a month come from; the feature is completely broken but affects almost nobody |
| Low Severity | A typo in the company name on the home page banner the day before a sale: nothing is broken, but everyone sees it | An icon in the footer of the “Delivery info” page is 2 px off |
How to remember it: severity is about the product, priority is about the business. The severity of a given bug doesn’t change unless the bug itself changes. Priority can change tomorrow: a release is coming, a big client arrived, a sale has started.
The Bug Life Cycle
The bug life cycle is a ticket’s path from “found” to “closed”. Every team names the statuses its own way, but the logic is the same.
New --> Open/Assigned --> In Progress --> Fixed --> Ready for Retest
| ^ | |
| | still broken fixed
| | v v
| +------------------------------------- Reopened Verified --> Closed
|
+--> Rejected (not a bug / works as designed)
+--> Duplicate (already reported)
+--> Deferred (will be fixed later)
+--> Cannot Reproduce (developer could not repeat it)
| Status | What happens | What the tester does |
|---|---|---|
| New | The bug is filed, nobody has looked at it yet | Writes the report, searching for duplicates first |
| Open / Assigned | The bug is confirmed and assigned to a developer | Answers questions, clarifies the steps |
| In Progress | The developer is fixing it | Doesn’t wait: keeps testing |
| Fixed | The fix is written but not on the test environment yet | Keeps track of which build it will land in |
| Ready for Retest | A build with the fix is on the test environment | Repeats the steps from the report and checks neighbouring scenarios |
| Verified / Closed | The bug no longer reproduces | Writes in a comment which build it was verified on and closes it |
| Reopened | The bug reproduced again | Returns the ticket with new facts: build, steps, attachments |
| Rejected | The team decided it’s not a bug | Checks the requirements; if they disagree — makes the case |
| Duplicate | This bug already exists | Adds their details to the original ticket |
| Deferred | The bug is real but will be fixed later | Makes sure the decision was made by the person responsible for it and that the bug is on the known issues list |
| Cannot Reproduce | The developer couldn’t repeat it | Rechecks and extends the report — more on that below |
Two details that tell a practitioner from someone who memorised the diagram.
A retest is more than “the steps from the report”. The discount recalculation on quantity change was fixed? Also check removing an item from the cart, adding a second item and changing the promo code. A fix in one place often breaks the one next to it.
In Jira some of these “statuses” are actually resolutions. The ticket moves to Done, and the Resolution field says Duplicate, Won't Do or Cannot Reproduce. If you say in an interview that you know the difference between a status and a resolution, it will sound like experience, not theory.
When a Developer Says “Not a Bug” or “Cannot Reproduce”
This is a working situation, not a conflict. The goal is not to win the argument but to find out how the product should work.
“Not a bug” (Rejected, Works as Designed)
- Find the requirement. The specification, the mockup, the acceptance criteria in the ticket. If it says how things should be — attach a link and a quote.
- If there is no requirement, it’s not a dispute between two people. The question goes to whoever is responsible for the product: the product manager or the analyst. The tester and the developer don’t decide between themselves how it should work.
- Describe the impact on the user. Not “I feel this is wrong”, but “the customer will see one total in the cart and another in the confirmation email”.
- If the decision is not to fix — record the decision. A comment in the ticket: who decided and why. Sometimes a rejected bug turns into an improvement ticket — that’s fine.
“Cannot Reproduce”
- Repeat it yourself — from scratch. A clean browser profile, a new account, steps strictly by the report. It often turns out that some condition didn’t make it into the report.
- Compare the environments. Build, test environment, browser, user role, test data, enabled feature flags. The developer may have a different version or a different database locally.
- Add evidence. A video, console logs, a HAR file, the time of the event — the developer will use it to find the request in the server logs.
- Show it live. Five minutes at one screen often saves two days of messages.
- If the bug is intermittent — say so in numbers. “Reproduces 3 times out of 10, more often on a slow connection” is useful information, not a weakness of the report.
Anatomy of a Test Case
A test case is an instruction for one check. Following it, a person who sees the product for the first time should get the same result as you.
| Field | What to write |
|---|---|
| ID | A unique number: TC-CHK-012 |
| Title | What we check, in one phrase |
| Preconditions | The state of the system before the first step |
| Test data | Concrete values: account, item, promo code |
| Steps | Actions in order |
| Expected result | What should happen — for every step where there is something to check |
| Priority | How important the check is: it decides what goes into smoke and regression |
Example:
ID: TC-CHK-012
Title: A percentage promo code is applied to the order total in the cart
Priority: High
Requirement: REQ-CHK-06
Preconditions:
1. The user buyer_test_07 is logged in.
2. The cart is empty.
Test data:
Item: Ceramic Mug, $20.00
Promo code: SALE10 (10% off the whole order, active)
| # | Step | Expected result |
|---|---|---|
| 1 | Add Ceramic Mug to the cart, quantity: 2 | The cart counter shows 2 |
| 2 | Open the cart | Subtotal: $40.00. No Discount line. Total: $40.00 |
| 3 | Enter SALE10 in the Promo code field and click Apply |
The message “Promo code applied”. Discount: −$4.00. Total: $36.00 |
| 4 | Click Checkout | The checkout page is open. In the Order summary block: Discount −$4.00, Total $36.00 |
Typical test case mistakes:
| Mistake | What it looks like | Why it’s bad | How to fix it |
|---|---|---|---|
| Several checks in one case | “Check a valid, an expired and a non-existent promo code” | One step failed — the case is red, and what exactly is broken is unclear | One case — one check: three separate cases |
| A vague expected result | “The discount is calculated correctly” | Everyone understands “correctly” in their own way | Concrete values: “Discount: −$4.00, Total: $36.00” |
| Dependence on another case | “Run after TC-CHK-011” | If 011 failed or was skipped, 012 can’t be run either; the cases can’t be run in any order | Everything needed goes into the case’s own preconditions |
| No test data | “Enter a valid promo code” | The person running it will waste time looking for a code or pick the wrong one | Specify SALE10 and where to get a new one if this one is disabled |
Where the checks themselves come from — equivalence classes, boundary values, decision tables — is covered in the article on test design techniques. Here it’s only about how to write them down.
Checklist, Test Case and Test Scenario
Three formats of the same idea, with different levels of detail.
| Checklist | Test case | Test scenario | |
|---|---|---|---|
| What it is | A list of what to check | A step-by-step instruction for one check | A user’s path from start to finish |
| Example | “Promo code: valid, expired, non-existent, applied twice” | TC-CHK-012 from the example above | “A customer adds an item, applies a promo code, chooses delivery, pays by card and gets an email” |
| Level of detail | Low: what, without “how” | High: steps, data, expected result | Medium: a chain of actions without small steps |
| Maintenance cost | Low | High | Medium |
| When it fits | The team knows the product; little time; the UI changes often | Complex logic; newcomers in the team; tests are handed to an outside team; evidence is needed for an audit; a base for an automated test | End-to-end checks; acceptance testing; a demo for the customer |
| Main risk | Two people will check the same item differently | Goes out of date faster than anyone can update it | Failed in the middle — everything after it is unchecked |
A caveat: “test scenario” means different things in different companies. Some use it for a chain of actions, as in the table, and some for a high-level test idea (“check card payment”) that several test cases are then written for. In an interview it’s safer to say first what you mean by it.
In practice the formats are mixed: detailed test cases for the critical path (payment), checklists for the rest. Writing a detailed case for every hint in the UI is a way to spend a week on a document nobody will open.
Test Plan and Test Strategy
These two get mixed up most often, because both documents are “about how we test”.
| Test Strategy | Test Plan | |
|---|---|---|
| Level | The product or the whole company | A specific release, project or feature |
| The question it answers | How do we approach testing in general? | What, who and when tests in this release? |
| What’s inside | Test levels and types, the approach to automation, environments, tools, rules for handling bugs | Scope, schedule, people, environments, risks, entry and exit criteria |
| How often it changes | Rarely | Every release |
| Who writes it | The QA lead or QA manager | The QA lead or the tester who runs the release |
A short test plan for our example:
TEST PLAN: Checkout 2.14 (promo codes)
1. Scope
In scope: promo code field in cart, discount calculation,
order summary, order confirmation email
Out of scope: payment provider internals, admin panel for creating
promo codes (covered by a separate plan)
2. Approach
- Functional testing: test cases for discount calculation,
checklist for UI and error messages
- API testing: POST /cart/promo, GET /cart
- Regression: automated checkout suite + manual smoke on mobile
3. Environments and data
- staging, build 2.14.x
- Chrome, Firefox, Safari (latest), iOS Safari, Android Chrome
- Test accounts: buyer_test_01..10; promo codes: SALE10, FIX5, EXPIRED20
4. Entry criteria
- Build deployed to staging, smoke test passed
- Requirements REQ-CHK-06..10 approved
5. Exit criteria
- 100% of High priority test cases executed
- No open Blocker or Critical defects
- All open Major defects reviewed and accepted by the product manager
6. Risks
- Payment sandbox is unstable -> use a mock for negative scenarios
- One tester on vacation in week 2 -> mobile checks start in week 1
7. Schedule and roles
- Week 1: test design, API checks; week 2: functional + regression, report
- Sign-off: QA lead, product manager
Formally, the structure of such documents is described in the ISO/IEC/IEEE 29119-3 standard (formerly IEEE 829). You don’t need to know it by heart. It’s enough to remember that a test plan answers the questions: what, how, where, who, when, under which conditions we start and finish, what can go wrong.
Traceability Matrix
A traceability matrix (Requirements Traceability Matrix, RTM) is a table that links requirements to test cases. It answers two questions: “is everything covered?” and “what do we recheck if a requirement changes?”
| Requirement | Description | Test cases | Result | Bugs |
|---|---|---|---|---|
| REQ-CHK-06 | A percentage promo code reduces the order total | TC-CHK-012, TC-CHK-013 | Passed | — |
| REQ-CHK-07 | The discount is recalculated on any change to the cart | TC-CHK-014, TC-CHK-015, TC-CHK-016 | Failed | BUG-482 |
| REQ-CHK-08 | An expired promo code is rejected with a message | TC-CHK-017 | Passed | — |
| REQ-CHK-09 | Only one promo code can be applied to an order | TC-CHK-018, TC-CHK-019 | Passed | — |
| REQ-CHK-10 | A promo code does not apply to the delivery cost | — | Not covered | — |
The most useful row here is the last one. There isn’t a single test case for requirement REQ-CHK-10. Without the matrix this gap would have been noticed in production.
Keeping it by hand in a spreadsheet is hard work. Usually the links are set in the test management system — a test case refers to the ticket with the requirement, and the coverage report builds itself.
Test Report
A test report (test summary report) is the document a release decision is based on. It’s read by a manager and a team lead who have three minutes for it. So the conclusion goes in the first line.
TEST SUMMARY REPORT: Checkout 2.14 (promo codes)
Build: 2.14.0-rc3 Environment: staging Period: 2 weeks
SUMMARY
Not recommended for release until BUG-482 is fixed.
Everything else is ready.
EXECUTION
Planned: 120 test cases
Executed: 116
Passed: 108
Failed: 6
Blocked: 2 (payment sandbox was down)
Not run: 4 (Android tablet, device not available)
Pass rate: 93% of executed (108 / 116)
REQUIREMENTS COVERAGE
25 requirements in scope
24 covered by at least one executed test case
1 not covered: REQ-CHK-10 (promo code and delivery cost)
OPEN DEFECTS
Blocker: 0
Critical: 0
Major: 2 (BUG-482 discount not recalculated; BUG-490 ...)
Minor: 5
Trivial: 3
RISKS AND WHAT WAS NOT TESTED
- Android tablet layout: not tested
- Declined-card scenarios: tested on a mock only
What a report must contain: the conclusion, what exactly was tested (build, environment), what was executed, what was not executed and why, open bugs by severity, risks. The “what was not tested” section is the most honest and the most useful: it shows where your confidence ends.
Not all metrics are equally honest.
| Metric | What it shows | Verdict |
|---|---|---|
| Pass rate (share of passed among executed) | The state of the build in the part that was checked | Honest, if the number of tests not run is shown next to it |
| Open bugs by severity | What exactly is wrong with the product right now | Honest: decisions are made on it |
| Requirements coverage | Which requirements have at least one executed test | Honest, but “covered” doesn’t mean “checked well” |
| Number of test cases written | How much text was produced | Misleading: 500 tiny cases are no better than 50 well-thought-out ones |
| Number of bugs per tester | Who filed more tickets | Misleading and harmful: people start splitting bugs and filing trivia, and whoever tested the most stable module looks the worst |
The general rule: a metric is honest if it describes the product. A metric is suspicious if it describes people’s activity. As soon as a number becomes a target, people start adjusting it.
Smoke, Sanity and Regression
Three words candidates mix up.
| Smoke | Sanity | Regression | |
|---|---|---|---|
| Question | Is the build alive at all? | Does the specific change work? | Did anything that used to work break? |
| When | On every new build, before the other tests | After a bug fix or a small change | Before a release; after changes that could affect other parts |
| Scope | Wide and shallow: one check per main feature | Narrow and deeper: one area | Wide and deep: everything that already worked |
| Example in checkout | The catalogue opens, an item goes into the cart, an order can be placed | After the BUG-482 fix: discount recalculation when an item is changed, removed and added | The whole checkout: delivery, payment, promo codes, emails, order history |
| If it fails | The build is sent back, no further testing | The ticket goes back to the developer | Bugs are filed, the fate of the release is decided |
A caveat worth knowing: the ISTQB glossary lists “sanity test” as a synonym of “smoke test”. The split in the table is industry practice, not a standard, and different teams draw the line differently. If asked in an interview — explain the difference as in the table and add that the terms aren’t separated everywhere.
Smoke and regression are the first candidates for automation: they run on every build right in the pipeline. How that works is in the article on CI/CD.
Entry and Exit Criteria
Entry criteria are the conditions without which there is no point in starting testing. Exit criteria are the conditions under which testing is considered finished.
| Entry criteria | Exit criteria | |
|---|---|---|
| Question | Can we start? | Can we stop? |
| Examples | The build is deployed to the test environment | All High priority test cases are executed |
| The smoke test passed | No open Blocker or Critical bugs | |
| The requirements are approved | Open Major bugs are reviewed and accepted by the product manager | |
| Test data and access are ready | The test report is sent |
Why this matters. Without entry criteria the team tests a build where login doesn’t work and loses a day. Without exit criteria testing ends not when the product is ready but when time runs out.
An important nuance: “no bugs found” is a bad exit criterion. You can also find no bugs because nobody looked for them.
One more thing: exit criteria don’t mean the tester approves the release. QA reports whether the criteria are met and which risks remain. The decision is made by whoever is responsible for the product.
Tools
Briefly, what you’ll meet in job postings. The principles are the same everywhere, the buttons differ.
| Tool | What it is | What you need to know |
|---|---|---|
| Jira | An issue tracker from Atlassian | Bugs, tasks and requirements live here. There are no test cases out of the box: they’re added with apps or kept in a separate system |
| TestRail | A standalone test management system (TMS) | Test cases, test runs, reports. It connects to Jira through an integration: a bug is filed from a failed test |
| Xray | An app for Jira | Tests are stored as Jira issues of special types, so the “requirement — test — bug” link lives inside one tool |
| Zephyr | A family of Jira apps from SmartBear | The same idea: test cases and runs inside Jira |
| Qase | A standalone cloud TMS | Test cases, runs, integrations with trackers and test automation frameworks |
If you’re asked in an interview about a tool you haven’t used — no problem. Say what you have used and that the entities are the same everywhere: test case, suite, run, result, link to a bug. A new TMS takes a couple of days to learn. The ability to write a clear bug report takes noticeably longer.
Tasks from Real Interviews
Task 1: “File the bug”
The “Pay” button can’t be tapped in Safari on iPhone. Write a bug report.
Answer: first I’ll ask questions — that’s what is expected of me. Which model and iOS version? Does it never work or only under some condition? What does “can’t be tapped” mean: the button is disabled, there’s no reaction to the tap, or the request is sent but fails? Does it work in other browsers?
Then I’ll file it by the structure. A title by the “what, where, under which condition” formula: “Checkout: the ‘Pay’ button doesn’t respond to taps in Safari on iOS when the on-screen keyboard is open”. Environment: device, iOS version, build. Preconditions, numbered steps with concrete data, actual and expected result, a screen recording. Severity — Critical, if an order can’t be paid for on this platform and there is no workaround. For priority I’ll suggest High and explain: this is the path the shop earns money on.
Task 2: “Severity and priority”
Give an example of a bug with high severity and low priority. And the other way round.
Answer: definitions first. Severity is how badly the bug breaks the product. Priority is how urgently it should be fixed.
High severity, low priority: checkout crashes completely in an old browser that a few customers a month come from. The feature is entirely broken, but the business loses almost nothing — it will be fixed after more important tasks.
Low severity, high priority: a typo in the company name on the home page banner the day before a big sale. Technically nothing is broken, but every visitor sees it — it gets fixed today.
Task 3: “Cannot reproduce”
A developer closed your bug with the status Cannot Reproduce. What do you do?
Answer: I don’t silently reopen it. First I reproduce it myself from scratch — in a clean profile, strictly by my own steps. If I can’t, the report was missing a condition, and I look for it: data, role, order of actions, state of the cart.
If it does reproduce, I compare environments with the developer: build, test environment, browser, account, feature flags. I extend the report: a video, console logs, a HAR file, the exact time so the request can be found in the server logs. If that still doesn’t help, I offer to show it live.
If the bug is intermittent, I write the frequency: “3 out of 10”. And only after that do I reopen it — with the new facts in a comment.
Task 4: “There’s no time for test cases”
The feature arrived in testing today, the release is tomorrow. There are no test cases. What will you do?
Answer: I won’t write detailed test cases — they would take all the time. I’ll make a checklist and prioritise it by risk: first the places where an error costs money or blocks the user (total calculation, payment), then the rest.
The order of work: a smoke test of the build, checks from the checklist top to bottom, and at the end a short regression of the neighbouring areas the change could have touched.
And I’ll tell the team in advance what exactly I won’t have time to check. The report will have a “not tested” section with the risks. The decision to release with those risks belongs to the manager, but they should make it with their eyes open. After the release the checklist turns into proper test cases for regression.
Task 5: “Pass rate 100%”
All test cases passed, the pass rate is 100%. Can we release?
Answer: from that number alone — I don’t know. I’ll ask clarifying questions.
- 100% of what? If 60 of the 120 planned cases were executed and all passed, that’s 100%, but half is unchecked
- Are all the requirements covered? I look at the traceability matrix: are there requirements without tests
- Which bugs are open? A test may have “passed” because the bug was filed earlier and the case was rewritten to match the current behaviour
- When were the test cases last updated? Outdated cases pass on a broken product too
- Are the exit criteria from the test plan met
The point of the answer: the pass rate is one of the metrics, not the decision. The decision is made on the whole picture: coverage, open bugs, untested areas, risks.
5 Traps Candidates Fall Into
1. Mixing up severity and priority.
Or knowing the definitions but being unable to give an example for the “crossed” cases. Learn one example for each cell of the 2×2 table — preferably your own.
2. Writing a title that tells you nothing.
“Error in the cart”, “Payment doesn’t work”. In an interview you’re often asked to write a bug report right in the chat — and the title is judged first. The formula: what, where, under which condition.
3. An expected result of “should work correctly”.
That’s not an expected result, it’s the absence of one. Correctly — meaning what? A number, a message text, a state, a link to the requirement.
4. Putting several bugs into one report.
“The discount isn’t recalculated in the cart, and also there’s a typo on the button and the page loads slowly.” One gets fixed, two get forgotten, and the ticket gets closed. One report — one bug. The same rule goes for test cases: one case — one check.
5. Believing that the tester approves the release.
To the question “you found a bug right before the release, what do you do?” they answer “I won’t let the release through”. QA is not a guard at the gate. The job is to give precise information: what is broken, who it will affect, what workarounds exist. The business makes the decision.
Checklist: What to Know Before the Interview
- Bug report: the fields, the title formula, how the actual result differs from the expected one; be able to write a report in five minutes
- Severity and priority: definitions, who sets them, an example for each cell of the 2×2 table
- Bug life cycle: the main statuses, what the tester does at each one; Rejected, Duplicate, Deferred, Cannot Reproduce
- Test case: the fields, one case — one check, a concrete expected result, independence of cases
- Formats: how a checklist differs from a test case and a scenario, when to choose which
- Test plan and strategy: what’s inside, how they differ; entry and exit criteria
- Traceability matrix and report: what the matrix links; what a report must contain; which metrics are honest and which aren’t
- Smoke, sanity, regression: the difference, with an example
- Tools: Jira and at least one TMS — at the level of “filed bugs, maintained test cases, ran test runs”
That’s enough for 90% of QA interviews. You don’t need to know standards by heart or templates with twenty sections — it’s enough to be able to write a bug report a developer can reproduce the error from on the first try, and to explain what each document is for.
Useful Resources
- ISTQB Glossary — the official glossary of testing terms. Handy for checking definitions before an interview.
- Bugzilla: Bug Writing Guidelines — Mozilla’s short guide to writing bug reports that get fixed.
- Atlassian: Jira Software guides — the official Jira guides: issues, statuses, workflows.
- Ministry of Testing — a testing community with articles and discussions, including on documentation and reporting.
Free QA course with hands-on exercises at annayev.com (English, Russian, Turkish).
Give it a thumbs up if this was useful. What question about bug reports or test documentation have you been asked in an interview? Tell us in the comments.